腾博会官网·专业效劳,诚信为本
/ Home
/ About CTG
/ Green Life
/ Business
/ News & Media
/ Sustainability
腾博会官网·专业效劳,诚信为本
Chinese
English
腾博会官网·专业效劳,诚信为本
腾博会官网·专业效劳,诚信为本
Home Bussiness Clean Energy Wind Power
Mile West Wind Farm

The 550 MW Mile West Wind Farm built by CTG in southwest China’s Yunnan province was connected to the grid on March 30, 2023.?
The 6.7-MW turbines used in this project have the highest single-capacity among all wind farms in mountainous regions in China. The project is anticipated to generate over 1.4 TWh of electricity annually, equivalent to the annual consumption of around 600,000 households. This will result in savings of approximately 450,000 tonnes of standard coal and a reduction of about 1.18 million tonnes of carbon dioxide emissions each year.

Clean Energy

Mile West Wind Farm

The 550 MW Mile West Wind Farm built by CTG in southwest China’s Yunnan province was connected to the grid on March 30, 2023.?
The 6.7-MW turbines used in this project have the highest single-capacity among all wind farms in mountainous regions in China. The project is anticipated to generate over 1.4 TWh of electricity annually, equivalent to the annual consumption of around 600,000 households. This will result in savings of approximately 450,000 tonnes of standard coal and a reduction of about 1.18 million tonnes of carbon dioxide emissions each year.
Contact Us
Address :No. 1 Liuhe Road, Jiang'an District, Wuhan City, Hubei Province, China
腾博会官网·专业效劳,诚信为本

Site Map

Link

Copyright 2022-2026 - China Three Gorges Corporation. All rights reserved.
腾博会官网·专业效劳,诚信为本
腾博会官网·专业效劳,诚信为本
Copyright 2022-2026 - China Three Gorges Corporation.
【网站地图】【sitemap】